GEYA’S PLANNED MANUFACTURING CAMPUS

A Phased 98,000m² Campus Development

GEYA is developing a new manufacturing campus with approximately 98,000m²of planned building area to support long-term growth in seating and table production.

Aerial view of steel-frame construction at GEYA’s planned 98,000m² manufacturing campus.
98,000㎡
Planned Building Area
Approx. total building area planned for production, showroom and support facilities.
2 Phases
Phased Development
Phase 1 is underway; Phase 2 is planned as long-term capacity needs develop.
2026
Construction Started
Construction began in 2026, with steel structure work progressing in phases.
40,000m²
Current Manufacturing Base
The existing facility remains in full operation during the new campus development.

98,000m² MANUFACTURING CAMPUS

A phased campus vision for future seating and table production, showroom presentation, quality coordination and logistics operations.

This planning rendering presents GEYA Seating’s vision for the future campus. Final buildings, layouts and operational details may change as the project develops.

Aerial planning rendering of GEYA’s 98,000m² future manufacturing campus with production, showroom and logistics areas.

On-Site Construction Progress

These on-site photographs document structural work at GEYA’s new manufacturing campus. Installation of steel columns and workshop frames is progressing as part of the phased 98,000㎡ development.

Foundation and steel column installation at GEYA’s new manufacturing campus construction site.

Foundation & Steel Column Installation

Foundation preparation and steel column installation form the early structural framework of GEYA’s new manufacturing campus.

Cranes assembling steel beams for GEYA’s future production workshop frame.

Main Workshop Frame Assembly

Cranes are assembling primary steel beams to connect the main framework of the future production workshops.

Large-span steel workshop structure under construction at GEYA’s planned manufacturing campus.

Large-Span Workshop Structure

The expanding steel framework shows the emerging scale and large-span configuration of the future production workshops.

Planned Campus Spaces and Functions

These planning renderings illustrate proposed spaces and functions within GEYA’s future manufacturing campus. The final layouts, facilities and operational details may be adjusted as the project develops.

Planning rendering of GEYA’s future office, showroom and production coordination building.

Integrated Office and Showroom Building

The proposed office and showroom building is intended to connect customer-facing, administrative and production teams for clearer communication and smoother project coordination.

Planning rendering of GEYA’s future customer reception and showroom for product presentations and B2B meetings.

Customer Reception and Showroom

The planned reception and showroom would provide space for customer visits, product presentations, sample reviews and B2B meetings.

Planning rendering of GEYA’s future material library with fabric, finish and surface samples.

Material Library for Project Review

A proposed material library would help customers compare fabrics, finishes, surfaces and product details during project reviews.

Planning rendering of GEYA’s future product review room for sample confirmation and B2B meetings.

Product Review and Meeting Room

The planned review room would support sample confirmation, material discussions and quality-focused meetings with B2B partners.

Planning rendering of a workshop coordination zone inside GEYA’s future manufacturing campus.

Production Coordination Office

A proposed glass-partitioned office close to production would support faster communication and more visible workshop coordination.

Planning rendering of a future quality testing lab for selected GEYA seating and table programs.

Quality Testing Lab

The planned testing lab would support inspection, durability checks and process control for selected seating and table programs.

Campus Planning Principles

These concept renderings illustrate planning priorities for safer circulation, employee support, visible workshop coordination and efficient logistics. Final layouts may change during development.

1

Safer Vehicle and Pedestrian Flow

Planning rendering of separate vehicle and pedestrian routes at GEYA’s future manufacturing campus.

Separate routes are planned to reduce conflicts among vehicles, employees and visitors while supporting safer daily campus circulation.

2

Employee Entrance and Support

Planning rendering of the employee entrance and support area at GEYA’s future manufacturing campus.

A planned employee entrance with check-in, seating, natural light and basic support facilities is intended to improve the daily work experience.

3

Visible Workshop Coordination

Planning rendering of a glass-partitioned workshop coordination zone close to future production areas.

A proposed glass-partitioned coordination zone close to production would support faster communication and clearer daily management.

4

Efficient Logistics Flow

Planning rendering of loading areas, warehouse access and logistics routes at GEYA’s future campus.

Planned loading areas, warehouse access and material routes are intended to enable smoother goods movement and finished-product handling.

Follow GEYA’s Campus Development

Follow documented construction updates as GEYA develops a future manufacturing campus for seating and table production. GEYA’s current manufacturing base remains fully operational throughout the phased development.

Construction Updates
On-Site Photographs
Development Milestones
Planning Updates
Planning rendering of the main entrance and manufacturing buildings at GEYA’s future campus.