GEYA INSIDE™ STANDARD

GEYA Inside™ Structural Standard

Internal structural standard for reinforced frame design, seating durability, and consistent OEM / ODM production.

GEYA Inside™ is GEYA’s internal engineering standard for structural reliability, seating durability, and consistent OEM / ODM production.
It helps selected seating programs combine reinforced frame logic with consistent metal frame fabrication and structural assembly, comfort support, durability validation and repeatable manufacturing control.

GEYA Inside structural standard showing upholstered chair with reinforced metal frame, comfort layer system, structural support design, and durability validation.
02 WHAT IS GEYA INSIDE™

What Is GEYA Inside™?

GEYA Inside™ is not a single part or material. It is a complete structural standard that defines how selected seating programs are built from the inside out.

It focuses on the unseen structure within selected seating programs: frame logic, comfort support, production consistency, and durability validation.

GEYA manufacturing strength and integrated furniture production capability
Not a Single Component

Not a Single Component

A coordinated system of modules working together.

Built Around What Matters Inside

Built Around What Matters Inside

Frame, foam, supports, and connections.

Made for Repeatable Production

Made for Repeatable Production

Supports consistency across repeat orders.

03 — BUILT WITH GEYA INSIDE™

Built with GEYA Inside™

Structural confidence starts with what is built inside the chair.

Each GEYA Inside™ seating program follows a defined build sequence — from upholstery and comfort layers to internal support, metal frame, and base connection.

Every layer is engineered to support strength, comfort, and consistent quality across repeat orders.

Defined Build Sequence

Engineered layers assembled in a defined order.

Controlled Production Logic

Defined checks and tolerances at key production steps.

Built for B2B Programs

Consistent quality for project and repeat orders.

Exploded view of GEYA Inside chair showing upholstered shell, comfort foam layers, support board, MetalCore frame, and base connection.
04 — FOUR CORE MODULES

Four Core Modules of GEYA Inside™

Frame structure, comfort layers, structural support, and durability validation work together to support reliable seating performance and repeatable production.

1

MetalCore™
Frame Structure

MetalCore frame structure module showing reinforced metal frame logic for GEYA Inside seating.

Reinforced metal-frame logic supports strength, stability, and repeatable production.

2

Comfort Layer System

Comfort layer system showing layered foam and upholstery support for GEYA Inside seating.

Layered foam and upholstery support daily seating comfort.

3

Structural Support Design

Structural support design showing defined support zones and load distribution for GEYA Inside seating.

Defined support zones help distribute seating loads more evenly.

4

Durability Review

Durability validation module for load stability and fatigue review of GEYA Inside seating programs.

Selected seating programs can be reviewed for load, stability, and fatigue performance based on project requirements.

05 — PERFORMANCE REVIEW

Internal Performance Review

Selected GEYA seating programs undergo internal performance reviews to support strength, durability, and stability in intended-use conditions.

Engineered for Everyday Use

Internal reviews simulate common seating loads, repeated use, and directional stability.

A

Static Load Test

Load-Bearing Evaluation

Static load test for upholstered chair seat and back structure.

Reference Load:

120kg

Internal Review Reference

B

Fatigue Test

Repeated Use Simulation

Seat fatigue test simulating repeated daily use on upholstered chair.

Review Range:

25,000–50,000 cycles

Program-Dependent Internal Review

C

Stability Test

Forward / Backward / Side

Chair stability review showing forward backward and side stability testing.

Review Directions:

Forward / Backward / Side

Internal Review Reference

Internal performance reviews support production consistency and product reliability across selected seating programs.

Note: Review methods and results vary by product structure, configuration, and project requirements.

GEYA INSIDE™ PRODUCT SYSTEMS

Explore GEYA Product Categories

Explore GEYA’s primary seating and table categories developed around structural consistency, material coordination and repeat-production requirements.

GEYA Inside seating standard with upholstered chair in a modern interior
07 PARTNER WITH GEYA

Build Seating Confidence with GEYA Inside™

A structural standard you can specify.

A production partner you can rely on.

From reinforced internal structures to scalable OEM / ODM production, GEYA Inside™ helps global buyers build seating programs with greater confidence and consistency.